In daily life, pressure vessels are divided into those in contact with fire sources and those not in contact with fire sources. In fact, pressure vessels also need anti-corrosion in daily life. For the anti-corrosion of pressure vessels, we need to do the following. Yunnan Electrically heated steam generator First, check the structure of its equipment components, safety valves, bursting discs, emergency vent valves and other collective Yixing pressure tanks to see if there is any corrosion. Once corrosion occurs, measures should be taken in a timely manner. Anti rust paint should be painted before the equipment is used. After use, it should be cleaned in a timely manner to ensure the cleanliness of the equipment. small-scale Electrically heated steam generator manufactor Secondly, it is necessary to protect the safety device of the pressure vessel. The safety device is an important device of the pressure vessel. Good protection should be carried out. Good maintenance should be carried out before and after use. It is necessary to apply lubricating oil and antirust paint.
As a large equipment, the maintenance of gas-fired hot blast stove is one of the things that must be done. Yunnan Electrically heated steam generator Regular maintenance can not only keep the hot blast stove clean, but also improve the service life of the hot blast stove. Therefore, it is the top priority in the use of hot blast stove. Today's editor will tell you how to maintain the hot blast stove regularly. In many manufacturers that use hot blast stoves, in order to better develop the enterprise, it is necessary to increase the number of hot blast stoves and improve the performance of hot blast stoves. small-scale Electrically heated steam generator manufactor When enterprises purchase hot blast stove equipment, they must understand their own needs and the products of hot blast stove manufacturers in the market. Therefore, the small edition of gas-fired hot blast stove tells us the problems to be considered in the selection of hot blast stove.
System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Yunnan Electrically heated steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. small-scale Electrically heated steam generator manufactor Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.
When using stainless steel storage tank, cracks appear on the head. If it is not handled in time, it will be dangerous, and how to handle this situation will be explained. Yunnan Electrically heated steam generator Firstly, the cracks in the stainless steel tank can were removed by polishing. After grinding, pits that do not need repair welding and do not affect the grading shall be formed within the allowable range. Otherwise, repair welding shall be carried out. The position of surface crack defect shall be determined by surface penetration defect detection, and the welding repair shall be completed. The horizontal gas tank shall be repaired, and the weld and surrounding materials shall be repaired. After that, argon tungsten arc welding shall be used for repair welding. small-scale Electrically heated steam generator manufactor Tungsten argon arc welding shall be adopted for welding repair. It is suitable for back welding or skip welding, small size multi-layer and multi pass non rotating welding to avoid overheating of the weld. Water cooling measures are adopted. The defects of stainless steel storage tanks shall be removed by grinding with angular grinding wheel with conical grinding rod. Note that the abrasive grains of the grinding wheel should be perpendicular to the crack length. If the defect is deep, crack stop holes shall be drilled at both ends of the defect to prevent the crack from expanding with the grinding process. According to the inspection, in the stainless steel storage tank with primary side inspection, there are cracks at the head welds, and these defective welds have different edge bite degrees. Do not panic when the stainless steel tank can has cracks. The oil tank works. The above measures can be taken to solve this problem.
The fluctuation of waste heat boiler flue gas in flow, temperature, composition, dust content and other aspects is one of its characteristics. The nature of the fluctuation can be regular, periodic, or irregular, aperiodic; The characteristics of fluctuation can be gradual. Yunnan Electrically heated steam generator It can also be impulsive; It can be a single parameter or a composite fluctuation of multiple parameters. The selection of waste heat boiler shall first analyze the whole cycle of the main process flow, and determine the flue gas characteristics of each time section in the cycle. small-scale Electrically heated steam generator manufactor Therefore, corresponding measures shall be implemented one by one in the design of waste heat boiler. The prominent feature is often the main basis for the selection of waste heat boiler.
It can only be prevented by adding medicine to the pot. Yunnan Electrically heated steam generator Adding drugs to the boiler can further soften the water quality, making up that the softening water equipment cannot replace silicon, sulfur and heavy metal ions and anions, so that impurities such as suspended solids, water slag and scale in dissolved water have good looseness and fluidity, and then the impurities are discharged by sewage, thus preventing scale. The water treatment method is carried out in the pot, so it is called water treatment method in the pot. small-scale Electrically heated steam generator manufactor Therefore, boiler water treatment actually includes water treatment of feed water and quantitative feeding treatment in the boiler. Water treatment should only be carried out without adding drugs. The boiler water index basically does not meet the specified requirements, and the boiler cannot operate under good water quality. This is also the main reason for the softened water device. The softened water is also qualified, and the boiler will also be polluted.