夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

contact us Contact Us

Henan Yuji Boiler Vessel Manufacturing Co., Ltd

Service hotline: 400-032-0266

Tel: 0373-5850299

Contact: Manager Xu 17530719767

Email: [email protected]

Website: pinpaicloud.cn

Address: No.8 Jizhong Road, Xiaoji Town, Xinxiang, Henan


How much is the vertical electric steam generator in Shaanxi

2020-07-03
 How much is the vertical electric steam generator in Shaanxi

Stainless steel for pressure vessels and its welding characteristics. The so-called stainless steel refers to the addition of a certain amount of chromium in the steel to keep the steel in a passive state and free from rust. Shaanxi electric steam generator For this purpose, the chromium content must be more than 12%. In order to improve the passivity of steel, it is often necessary to add nickel, molybdenum and other elements that can passivate steel into stainless steel. Stainless steel is generally referred to as stainless steel and acid resistant steel. Stainless steel companies do not have certain acid resistance, and acid resistant steel generally has a good stainless property. vertical electric steam generator how much According to its steel structure, stainless steel can be divided into four categories, namely, austenitic stainless steel, ferritic stainless steel, martensitic stainless steel, and austenitic ferritic duplex stainless steel.

 How much is the vertical electric steam generator in Shaanxi

Enterprises that rely on coal for power generation are both traditional power enterprises and highly polluting enterprises. The industrial waste gas discharged by coal power generation enterprises has seriously polluted our living environment. Shaanxi electric steam generator As a result, the country has become more and more strict in the control of this industry, and how to use waste heat recycling power generation has become a topic of concern for many enterprises. Waste heat boiler can meet this demand of enterprises, so its application in coal mine power generation enterprises is more and more. vertical electric steam generator how much Installing a waste heat recovery boiler on the exhaust pipe of the coal mine gas generator set, using the waste heat discharged by the coal mine gas generator set to generate steam for power generation, can not only turn waste into treasure to realize the secondary utilization of energy, achieve the goal of combining coal mine gas control with energy conservation and emission reduction, but also reduce environmental pollution, kill two birds with one stone.

 How much is the vertical electric steam generator in Shaanxi

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Shaanxi electric steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical electric steam generator how much When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

 How much is the vertical electric steam generator in Shaanxi

The hardness of water is mainly formed and expressed by calcium and magnesium, so cation exchange resin (water softener) is generally used to replace Ca2+and Mg2+(the main component forming scale) in the water. With the increase of Ca2+and Mg2+in the resin, the efficiency of the resin to remove Ca2+and Mg2+gradually decreases. Shaanxi electric steam generator When the resin absorbs a certain amount of calcium and magnesium ions, it must be regenerated. The regeneration process is to wash the resin layer with salt water in the salt tank to replace the hardness ions on the resin. With the regeneration waste liquid discharged out of the tank, the resin will resume its softening and exchange function. vertical electric steam generator how much Because the hardness of water is mainly formed by calcium and magnesium and represents that the hardness of water is mainly formed by calcium and magnesium and represents the principle of sodium ion exchange softening treatment, which is to exchange the hardness components Ca2+and Mg2+in the water with the Na+in the resin by passing the raw water through the sodium cation exchange resin, so as to absorb Ca2+and Mg2+in the water and soften the water.

 How much is the vertical electric steam generator in Shaanxi

The steam generator pressure controller is used to control the generator, because it has no water level display, no board control, and its heating control is mainly controlled by the floating water level controller. Shaanxi electric steam generator When the water level is moderate, the floating point is connected to the control voltage to operate and heat the AC contactor. The generator has a simple structure and is currently used in the market. The common non heating fault of this generator is mainly found in the float level controller. First check the external wiring of the float level controller, connect the upper and lower control lines, and then remove the float level controller to see if it is flexible. vertical electric steam generator how much You can use the manual to use the meter to determine whether the upper control point and the lower control point can be connected. Check the equipment and check for water. The float can fill the fuel tank, replace the float, and eliminate faults.