Biomass boilers need green new energy. Compared with other boilers, biomass boilers have the following four major advantages: one boiler is multi-purpose, and can cook, boil water, and bathe while heating. Strong conversion system, low starting heat transfer temperature and fast heat transfer speed. Shanxi electric steam generator Low installation cost, safe heating: the equipment is universal, without changing the original heating equipment, and the pipes and radiators are universal. Water circulation is used to achieve a wide range of heating materials, which will never be exhausted. It can be taken everywhere (such as rice husks, corn stalks, rice stalks, wheat). Safety and environmental protection: low working pressure, cooking, water boiling, bathing, heating, etc., and it is also suitable for burning boilers, greenhouse heating Large area heating and small and medium-sized hotels can be used all year round without seasonal restrictions. vertical electric steam generator factory The reason why the ignition of biomass boiler is difficult is that the stable small fire signal cannot be established, which is caused by the failure of the small fire detector to detect the fire normally. The flame detector for small fire is ionization type flame detector, which requires a contact area with the flame, stable flame size, and gas pressure controlled within a strict range.
The waste heat recovery of flue gas can not only be used for heating or power generation to achieve energy-saving effect, but also can be beneficial to environmental protection and achieve dual effects of energy conservation and environmental protection. Shanxi electric steam generator In general, the important equipment of waste heat power generation is waste heat boiler, which mainly uses heat or combustible substances in waste gas, waste liquid and other working medium as heat source, and produces steam mainly for power generation. There are many ways to recover waste heat from flue gas of waste heat boiler. Generally, comprehensive utilization of waste heat is followed by direct utilization and indirect utilization. vertical electric steam generator factory Generally speaking, if heat sources are needed in the process, the waste heat utilization is mainly comprehensive utilization. First, the heat source is recovered and fed back to the process for reuse. If there is any surplus, it can be used for power generation or as the heat source for central heating; If there is no surplus, it will be directly used instead of being used for power generation; If the process does not need more heat sources, then indirect use, mainly power generation or public heating.
After the cold furnace of oil fired and gas fired boiler is ignited, the speed of temperature rise shall be controlled at 10 ℃/hour, mainly because the viscosity of oil temperature is large when it is cold, and the flow rate in the heating surface pipe of the whole equipment is relatively low. Shanxi electric steam generator The oil film on the pipe wall is thick, so the heat transfer condition is poor when in use. If the heating speed of oil and gas fired boiler is too fast during use, it is easy to make the local oil film temperature too high. The equipment is in the stage of driving away the residual moisture and moisture contained in the heat conduction fluid in the system within the temperature range. vertical electric steam generator factory In oil and gas fired boiler, when the steam exhaust volume at the vent pipe of the expander is relatively large, there will be water hammer at the bottom of the equipment. In this way, the vibration of the pipeline will accelerate, and when the swing amplitude of the pressure gauge pointer in each part of the equipment is large, the temperature rise will be stopped and the constant temperature state will be maintained.
System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Shanxi electric steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical electric steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.