Enterprises that rely on coal for power generation are both traditional power enterprises and highly polluting enterprises. The industrial waste gas discharged by coal power generation enterprises has seriously polluted our living environment. Hunan Electrically heated steam generator As a result, the country has become more and more strict in the control of this industry, and how to use waste heat recycling power generation has become a topic of concern for many enterprises. Waste heat boiler can meet this demand of enterprises, so its application in coal mine power generation enterprises is more and more. vertical Electrically heated steam generator factory Installing a waste heat recovery boiler on the exhaust pipe of the coal mine gas generator set, using the waste heat discharged by the coal mine gas generator set to generate steam for power generation, can not only turn waste into treasure to realize the secondary utilization of energy, achieve the goal of combining coal mine gas control with energy conservation and emission reduction, but also reduce environmental pollution, kill two birds with one stone.
Biomass boilers need green new energy. Compared with other boilers, biomass boilers have the following four major advantages: one boiler is multi-purpose, and can cook, boil water, and bathe while heating. Strong conversion system, low starting heat transfer temperature and fast heat transfer speed. Hunan Electrically heated steam generator Low installation cost, safe heating: the equipment is universal, without changing the original heating equipment, and the pipes and radiators are universal. Water circulation is used to achieve a wide range of heating materials, which will never be exhausted. It can be taken everywhere (such as rice husks, corn stalks, rice stalks, wheat). Safety and environmental protection: low working pressure, cooking, water boiling, bathing, heating, etc., and it is also suitable for burning boilers, greenhouse heating Large area heating and small and medium-sized hotels can be used all year round without seasonal restrictions. vertical Electrically heated steam generator factory The reason why the ignition of biomass boiler is difficult is that the stable small fire signal cannot be established, which is caused by the failure of the small fire detector to detect the fire normally. The flame detector for small fire is ionization type flame detector, which requires a contact area with the flame, stable flame size, and gas pressure controlled within a strict range.
The main parts of the waste heat boiler can be divided into drum, pipe, header, membrane wall, tube panel, tube box, etc. These parts are the parts with specific process requirements in the waste heat boiler. Hunan Electrically heated steam generator For example, the drum should go through metal flaw detection, heat treatment, hydrostatic test and other processes to improve the stability of the waste heat boiler. At the same time, because the header needs high sealing, manual welding is required, and the welding quality needs to be tested. It can be seen that due to the complexity of the working environment of the waste heat boiler, it has special requirements for its internal structural members. vertical Electrically heated steam generator factory In the process of designing and manufacturing the waste heat boiler, the process designer should consider the advantages and disadvantages of various processes, and then select a reasonable process to complete the manufacturing of the waste heat boiler. For example, the serpentine parts in the waste heat boiler cannot be bent automatically by the machine, so they can only be bent manually.
The waste heat boiler greatly improves the utilization rate of heat released by fuel combustion, so this kind of boiler saves energy; Fuel oil, gas and coal combustion generate high-temperature flue gas to release heat. The high-temperature flue gas first enters the furnace, then enters the waste heat recovery device of the front smoke box, then enters the pyrotechnic tube, and then enters the waste heat recovery device in the flue of the rear smoke box. The high-temperature flue gas turns into low-temperature flue gas and is discharged into the atmosphere through the chimney. Hunan Electrically heated steam generator Conditions conducive to quick startup of waste heat boiler: (1) The waste heat boiler adopts forced circulation, which has the priority of quick startup. (2) The flue gas baffle is hydraulically controlled, which can be used to adjust the sky in principle. The flue gas flow into the boiler is reduced. (3) The adjustable guide vane at the inlet of gas turbine can not only adjust the flue gas flow of gas turbine, but also increase or decrease the exhaust gas temperature of gas turbine through the selection of IGV temperature control mode. (4) The steam turbine bypass is designed for the rated evaporation capacity of the boiler. (5) The welded bends and headers of each heating module of the boiler are in the boiler. (6) Similar boilers in other gas turbine power plants can not be reduced when starting, and can be used to adjust the main steam pressure of the boiler. Outside the wall, contact with high-temperature smoke is avoided. vertical Electrically heated steam generator factory Operating experience of gas turbine load, such as simultaneous startup of gas turbine and waste heat boiler (flue gas damper fully open). Under the possibility of quick startup of waste heat boiler, the water level of steam drum and deaerator will lose control after the flue gas baffle is opened.
System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Hunan Electrically heated steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Electrically heated steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.
The steam generator pressure controller is used to control the generator, because it has no water level display, no board control, and its heating control is mainly controlled by the floating water level controller. Hunan Electrically heated steam generator When the water level is moderate, the floating point is connected to the control voltage to operate and heat the AC contactor. The generator has a simple structure and is currently used in the market. The common non heating fault of this generator is mainly found in the float level controller. First check the external wiring of the float level controller, connect the upper and lower control lines, and then remove the float level controller to see if it is flexible. vertical Electrically heated steam generator factory You can use the manual to use the meter to determine whether the upper control point and the lower control point can be connected. Check the equipment and check for water. The float can fill the fuel tank, replace the float, and eliminate faults.