Gas steam generator is also called gas steam boiler. The steam temperature is not high when the steam gas and steam generator has a fault. How can we solve this problem. Gansu Electric steam generator Generally, there are two situations: physical characteristics of water vapor: it will evaporate when reaching 100 ℃, and it is impossible for steam to reach a higher temperature. Although the measured temperature of steam is higher when it receives pressure, the temperature will drop to 100 ℃ as soon as it reaches normal atmospheric pressure. vertical Electric steam generator factory The way not to imagine that the pressure of the steam engine will rise is to make the steam negative pressure. Every increase of about 1kg in steam pressure will increase the steam temperature by about 10 ℃, so by analogy, you need to increase the pressure as much as you need the temperature. I hope it is useful to you.
It can only be prevented by adding medicine to the pot. Gansu Electric steam generator Adding drugs to the boiler can further soften the water quality, making up that the softening water equipment cannot replace silicon, sulfur and heavy metal ions and anions, so that impurities such as suspended solids, water slag and scale in dissolved water have good looseness and fluidity, and then the impurities are discharged by sewage, thus preventing scale. The water treatment method is carried out in the pot, so it is called water treatment method in the pot. vertical Electric steam generator factory Therefore, boiler water treatment actually includes water treatment of feed water and quantitative feeding treatment in the boiler. Water treatment should only be carried out without adding drugs. The boiler water index basically does not meet the specified requirements, and the boiler cannot operate under good water quality. This is also the main reason for the softened water device. The softened water is also qualified, and the boiler will also be polluted.
The long-term use of gas-fired boilers will inevitably lead to problems of one kind or another. However, the working principle of gas-fired boiler is complex, and the price of gas-fired boiler is particularly high, so it is necessary to select high-quality gas-fired boiler manufacturers and companies with good after-sales service. Gansu Electric steam generator In addition, what should we do if the gas boiler fails? As the gas-fired boiler involves the construction of gas and lines, the professional installation personnel of the manufacturer must check the installation at home, and the professional personnel shall install it. Improper installation will bring a series of problems for future use. vertical Electric steam generator factory The existing pipes and radiators in China need to be observed by professional engineers and installation personnel to determine whether they can continue to be used. If the service life is long, the heating system may scale more. It is generally recommended that the user replace it to obtain better heating effect.
The produced waste heat boiler for hazardous waste incineration is a natural circulation water tube boiler, which adopts a single drum vertical layout and a full membrane water wall structure. Gansu Electric steam generator The surrounding, top and three middle membrane water-cooled walls form a tight series of heat exchange flues. The convection heating surface is no longer arranged inside the heat exchange flue, and radiation heat exchange is adopted, so as to ensure the smooth flow of high-temperature flue gas containing strong coking adhesive ash in the heat exchange flue. Full automatic shock soot blower is arranged on the membrane water wall, and inspection holes and observation holes are reserved. vertical Electric steam generator factory The bottom of the boiler is composed of membrane water walls on both sides to form a water-cooled ash bucket, and the lower part is connected with a closed spiral ash extractor. The settled soot in the waste heat boiler and the ash removed by the soot blower are discharged out of the boiler by the ash extractor. The furnace wall is of pipe laying structure, and the outside is covered with corrugated steel plate.
The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Gansu Electric steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Electric steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.