Anhui vertical waste heat boiler manufacturer

2020-12-21
 Anhui vertical waste heat boiler manufacturer

Waste heat boilers are widely used in high energy consumption industries. There are two common types of waste heat boilers: one is used to recover the exhaust gas emitted by ordinary boilers, such as fuel fired and gas-fired boilers, biomass fired boilers, etc. The temperature of the exhaust gas from ordinary boilers is about 600 ℃, which is not too high, Therefore, the requirements for waste heat recovery boiler are relatively low. Anhui Waste heat boiler The other is industrial waste heat recovery boiler, such as building materials industry, chemical industry, steel making industry, etc. The temperature of waste gas and waste heat in these industries is high, and the recovery and utilization is also very valuable. vertical Waste heat boiler manufactor Henan Yuji Boiler Vessel Manufacturing Co., Ltd., founded in 2005, is located at No. 8, Jizhong Road, Xiaoji Town, Xinxiang County, Henan Province. It is a comprehensive enterprise of boiler and pressure vessel, mainly engaged in the manufacturing of boilers and pressure vessels, with technological innovation as the core, integrating the design, manufacturing, sales, installation, transformation and maintenance of boilers and pressure vessels.

 Anhui vertical waste heat boiler manufacturer

Most people may already know something about flue gas waste heat recovery, because they have already explained a lot about it. In order to let you know the relevant knowledge of flue gas waste heat recovery, the following is a brief introduction to the two methods commonly used for recovery. Anhui Waste heat boiler Two methods are usually adopted for flue gas waste heat recovery: one is to preheat the workpiece; The other is to preheat air for combustion support. The flue gas preheating workpiece needs to occupy a large volume for heat exchange, which is often limited by the operation site (this method cannot be used for furnaces that are used intermittently). vertical Waste heat boiler manufactor Preheating air for combustion support is a good method. It is generally configured on the heating furnace, which can also strengthen combustion, speed up the temperature rise of the furnace, and improve the thermal performance of the furnace. This can not only meet the requirements of the process, but also achieve significant comprehensive energy-saving effect.

 Anhui vertical waste heat boiler manufacturer

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Anhui Waste heat boiler Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Waste heat boiler manufactor Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

 Anhui vertical waste heat boiler manufacturer

In daily life, pressure vessels are divided into those in contact with fire sources and those not in contact with fire sources. In fact, pressure vessels also need anti-corrosion in daily life. For the anti-corrosion of pressure vessels, we need to do the following. Anhui Waste heat boiler First, check the structure of its equipment components, safety valves, bursting discs, emergency vent valves and other collective Yixing pressure tanks to see if there is any corrosion. Once corrosion occurs, measures should be taken in a timely manner. Anti rust paint should be painted before the equipment is used. After use, it should be cleaned in a timely manner to ensure the cleanliness of the equipment. vertical Waste heat boiler manufactor Secondly, it is necessary to protect the safety device of the pressure vessel. The safety device is an important device of the pressure vessel. Good protection should be carried out. Good maintenance should be carried out before and after use. It is necessary to apply lubricating oil and antirust paint.

 Anhui vertical waste heat boiler manufacturer

The main parts of the waste heat boiler can be divided into drum, pipe, header, membrane wall, tube panel, tube box, etc. These parts are the parts with specific process requirements in the waste heat boiler. Anhui Waste heat boiler For example, the drum should go through metal flaw detection, heat treatment, hydrostatic test and other processes to improve the stability of the waste heat boiler. At the same time, because the header needs high sealing, manual welding is required, and the welding quality needs to be tested. It can be seen that due to the complexity of the working environment of the waste heat boiler, it has special requirements for its internal structural members. vertical Waste heat boiler manufactor In the process of designing and manufacturing the waste heat boiler, the process designer should consider the advantages and disadvantages of various processes, and then select a reasonable process to complete the manufacturing of the waste heat boiler. For example, the serpentine parts in the waste heat boiler cannot be bent automatically by the machine, so they can only be bent manually.