The existing industrial boiler flue gas waste heat recovery equipment mainly includes tubular heat exchanger and full heat pipe heat exchanger. Tube and tube heat exchanger can be composed of finned tube bundles. The advantage of finned tube is that it can withstand higher temperature, but has low heat transfer coefficient and large floor area. Hebei Steam generator The flue gas of industrial boilers contains sulfur and other acidic substances. In the low temperature zone (flue gas outlet section), the temperature may be lower than the dew point of the acidic substances. The acidic substances will dew on the pipe wall, corrode the shell of the fin tube. The fin tube heat exchanger has poor operating reliability and low service life. small-scale Steam generator factory The total heat pipe heat exchanger of boiler flue gas waste heat recovery equipment is composed of heat pipe bundles. Its shell is made of multi-layer composite materials. The heat pipe structure is complex, the cost is relatively expensive, the service life is short, and the steel consumption is large. It is difficult for users to accept it, and it is difficult to promote its application in production. The composite heat pipe heater not only takes into account the heat exchange effect, but also takes into account the economic affordability of the investors in production, which is particularly suitable for the current situation in China's industrial production.

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Hebei Steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. small-scale Steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Hebei Steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. small-scale Steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

During the operation of the gas generator set, the full combustion of gas and air generates a large amount of heat energy. The heat energy is converted into mechanical energy through the crankshaft connecting rod mechanism, and the generator converts this mechanical energy into electrical energy. However, some of the heat energy is still taken away by the exhaust gas and discharged from the cylinder block, resulting in the exhaust gas emission temperature of 500-600 ℃. In order to avoid this part of heat loss, waste heat boiler is used. If the high-temperature waste gas is directly discharged without treatment, it will inevitably cause excessive temperature in the workshop, accelerate the aging of equipment, affect the service life of equipment, and lead to a large use of cooling circulating water for the unit. If the waste heat boiler is installed, it can not only solve the above problems, but also generate steam energy for production and domestic use in the mine, so as to realize the recycling and comprehensive utilization of resources.

Waste heat boilers are widely used in high energy consumption industries. There are two common types of waste heat boilers: one is used to recover the exhaust gas emitted by ordinary boilers, such as fuel fired and gas-fired boilers, biomass fired boilers, etc. The temperature of the exhaust gas from ordinary boilers is about 600 ℃, which is not too high, Therefore, the requirements for waste heat recovery boiler are relatively low. Hebei Steam generator The other is industrial waste heat recovery boiler, such as building materials industry, chemical industry, steel making industry, etc. The temperature of waste gas and waste heat in these industries is high, and the recovery and utilization is also very valuable. small-scale Steam generator factory Henan Yuji Boiler Vessel Manufacturing Co., Ltd., founded in 2005, is located at No. 8, Jizhong Road, Xiaoji Town, Xinxiang County, Henan Province. It is a comprehensive enterprise of boiler and pressure vessel, mainly engaged in the manufacturing of boilers and pressure vessels, with technological innovation as the core, integrating the design, manufacturing, sales, installation, transformation and maintenance of boilers and pressure vessels.

Enterprises that rely on coal for power generation are both traditional power enterprises and highly polluting enterprises. The industrial waste gas discharged by coal power generation enterprises has seriously polluted our living environment. Hebei Steam generator As a result, the country has become more and more strict in the control of this industry, and how to use waste heat recycling power generation has become a topic of concern for many enterprises. Waste heat boiler can meet this demand of enterprises, so its application in coal mine power generation enterprises is more and more. small-scale Steam generator factory Installing a waste heat recovery boiler on the exhaust pipe of the coal mine gas generator set, using the waste heat discharged by the coal mine gas generator set to generate steam for power generation, can not only turn waste into treasure to realize the secondary utilization of energy, achieve the goal of combining coal mine gas control with energy conservation and emission reduction, but also reduce environmental pollution, kill two birds with one stone.