The hardness of water is mainly formed and expressed by calcium and magnesium, so cation exchange resin (water softener) is generally used to replace Ca2+and Mg2+(the main component forming scale) in the water. With the increase of Ca2+and Mg2+in the resin, the efficiency of the resin to remove Ca2+and Mg2+gradually decreases. Tianjin electric steam generator When the resin absorbs a certain amount of calcium and magnesium ions, it must be regenerated. The regeneration process is to wash the resin layer with salt water in the salt tank to replace the hardness ions on the resin. With the regeneration waste liquid discharged out of the tank, the resin will resume its softening and exchange function. vertical electric steam generator manufactor Since the hardness of water is mainly formed by calcium and magnesium and represents that the hardness of water is mainly formed by calcium and magnesium and represents the principle of sodium ion exchange and softening treatment, the principle is to pass raw water through sodium type cation exchange resin, so that the hardness components Ca2+and Mg2+in the water can exchange with the Na+in the resin, thereby adsorbing Ca2+ Mg2+, Soften the water.

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Tianjin electric steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical electric steam generator manufactor Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

Enterprises that rely on coal for power generation are both traditional power enterprises and highly polluting enterprises. The industrial waste gas discharged by coal power generation enterprises has seriously polluted our living environment. Tianjin electric steam generator As a result, the country has become more and more strict in the control of this industry, and how to use waste heat recycling power generation has become a topic of concern for many enterprises. Waste heat boiler can meet this demand of enterprises, so its application in coal mine power generation enterprises is more and more. vertical electric steam generator manufactor Installing a waste heat recovery boiler on the exhaust pipe of the coal mine gas generator set, using the waste heat discharged by the coal mine gas generator set to generate steam for power generation, can not only turn waste into treasure to realize the secondary utilization of energy, achieve the goal of combining coal mine gas control with energy conservation and emission reduction, but also reduce environmental pollution, kill two birds with one stone.

The existing industrial boiler flue gas waste heat recovery equipment mainly includes tubular heat exchanger and full heat pipe heat exchanger. Tube and tube heat exchanger can be composed of finned tube bundles. The advantage of finned tube is that it can withstand higher temperature, but has low heat transfer coefficient and large floor area. Tianjin electric steam generator The flue gas of industrial boilers contains sulfur and other acidic substances. In the low temperature zone (flue gas outlet section), the temperature may be lower than the dew point of the acidic substances. The acidic substances will dew on the pipe wall, corrode the shell of the fin tube. The fin tube heat exchanger has poor operating reliability and low service life. vertical electric steam generator manufactor The total heat pipe heat exchanger of boiler flue gas waste heat recovery equipment is composed of heat pipe bundles. Its shell is made of multi-layer composite materials. The heat pipe structure is complex, the cost is relatively expensive, the service life is short, and the steel consumption is large. It is difficult for users to accept it, and it is difficult to promote its application in production. The composite heat pipe heater not only takes into account the heat exchange effect, but also takes into account the economic affordability of the investors in production, which is particularly suitable for the current situation in China's industrial production.

The long-term use of gas-fired boilers will inevitably lead to problems of one kind or another. However, the working principle of gas-fired boiler is complex, and the price of gas-fired boiler is particularly high, so it is necessary to select high-quality gas-fired boiler manufacturers and companies with good after-sales service. Tianjin electric steam generator In addition, what should we do if the gas boiler fails? As the gas-fired boiler involves the construction of gas and lines, the professional installation personnel of the manufacturer must check the installation at home, and the professional personnel shall install it. Improper installation will bring a series of problems for future use. vertical electric steam generator manufactor The existing pipes and radiators in China need to be observed by professional engineers and installation personnel to determine whether they can continue to be used. If the service life is long, the heating system may scale more. It is generally recommended that the user replace it to obtain better heating effect.

As a large equipment, the maintenance of gas-fired hot blast stove is one of the things that must be done. Tianjin electric steam generator Regular maintenance can not only keep the hot blast stove clean, but also improve the service life of the hot blast stove. Therefore, it is the top priority in the use of hot blast stove. Today's editor will tell you how to maintain the hot blast stove regularly. In many manufacturers that use hot blast stoves, in order to better develop the enterprise, it is necessary to increase the number of hot blast stoves and improve the performance of hot blast stoves. vertical electric steam generator manufactor When enterprises purchase hot blast stove equipment, they must understand their own needs and the products of hot blast stove manufacturers in the market. Therefore, the small edition of gas-fired hot blast stove tells us the problems to be considered in the selection of hot blast stove.