The long-term use of gas-fired boilers will inevitably lead to problems of one kind or another. However, the working principle of gas-fired boiler is complex, and the price of gas-fired boiler is particularly high, so it is necessary to select high-quality gas-fired boiler manufacturers and companies with good after-sales service. Tianjin Gas fired hot blast stove In addition, what should we do if the gas boiler fails? As the gas-fired boiler involves the construction of gas and lines, the professional installation personnel of the manufacturer must check the installation at home, and the professional personnel shall install it. Improper installation will bring a series of problems for future use. vertical Gas fired hot blast stove how much The existing pipes and radiators in China need to be observed by professional engineers and installation personnel to determine whether they can continue to be used. If the service life is long, the heating system may scale more. It is generally recommended that the user replace it to obtain better heating effect.

When the boiler is shut down, the temperature of the heat transfer oil can be reduced to below 70 ℃ before the shutdown of the hot oil pump. In case of sudden power failure, extinguish the fire immediately, and then implement the operating procedures. Otherwise, the furnace tube will be burned out and the loss will be large. According to the type of heat transfer oil boiler, heat transfer oil shall be reasonably selected to prevent overheating. Tianjin Gas fired hot blast stove When purchasing unqualified heat transfer oil, do not save money or mix heat transfer oil indiscriminately. Otherwise, the consequences will be very serious. Prevent the oxidation of heat transfer oil. The strict heat transfer oil is more than 50 degrees in contact with the air, which will make the heat transfer oil crack. Its speed is amazing, and the consequences are relatively serious. After normal operation, the test crew needs to close the exhaust valve on the auxiliary exhaust pipe. After 6 months of use, the heat transfer oil must be sampled and tested according to the instructions. If problems are found, the heat transfer oil must be replaced immediately. vertical Gas fired hot blast stove how much However, it should be noted that different types of heat transfer oil should not be mixed. The circulation speed of the heat transfer oil should not be less than 1.5m/s. Due to the excessive temperature difference between some entrances and exits, the original design requirements were destroyed, the heat transfer oil could not maintain the original circulation state, the boundary layer became thicker, and the thermal resistance became larger, making the furnace wall exceed the oil film temperature, leading to carbon deposition, cracking, polymerization, coking, and even burning through the furnace tube.

The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Tianjin Gas fired hot blast stove The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. vertical Gas fired hot blast stove how much When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

The waste heat boiler for hazardous waste incineration is an important part of the hazardous waste rotary kiln incineration system. The heat source is the high-temperature waste gas containing strongly coking and cohesive ash after hazardous waste incineration. Tianjin Gas fired hot blast stove Generally, this type of waste heat boiler adopts single flue or multi flue layout, and convection heating surface is arranged in the flue. During operation, strongly coking cohesive ash is easy to adhere to the convection heating surface, leading to flue blockage, affecting the safe and normal operation of the waste heat boiler. According to the characteristics of hazardous waste rotary kiln incineration system, a kind of waste heat boiler with special structure suitable for the system was developed, which successfully solved the problems of ash deposition, wear, air leakage, corrosion, etc. vertical Gas fired hot blast stove how much The water circulation mode of the waste heat boiler is natural circulation. The working medium directly enters the drum, then is led out from the drum, flows into each membrane water wall through the downcomer, is heated here, then led back to the drum through the steam conduit, and is separated by the steam water separator, and then led out of the drum saturated steam with rated parameters.

Most people may already know something about flue gas waste heat recovery, because they have already explained a lot about it. In order to let you know the relevant knowledge of flue gas waste heat recovery, the following is a brief introduction to the two methods commonly used for recovery. Tianjin Gas fired hot blast stove Two methods are usually adopted for flue gas waste heat recovery: one is to preheat the workpiece; The other is to preheat air for combustion support. The flue gas preheating workpiece needs to occupy a large volume for heat exchange, which is often limited by the operation site (this method cannot be used for furnaces that are used intermittently). vertical Gas fired hot blast stove how much Preheating air for combustion support is a good method. It is generally configured on the heating furnace, which can also strengthen combustion, speed up the temperature rise of the furnace, and improve the thermal performance of the furnace. This can not only meet the requirements of the process, but also achieve significant comprehensive energy-saving effect.

Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Tianjin Gas fired hot blast stove Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. vertical Gas fired hot blast stove how much The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.