The waste heat recovery of flue gas can not only be used for heating or power generation to achieve energy-saving effect, but also can be beneficial to environmental protection and achieve dual effects of energy conservation and environmental protection. Jinan Energy saving steam generator In general, the important equipment of waste heat power generation is waste heat boiler, which mainly uses heat or combustible substances in waste gas, waste liquid and other working medium as heat source, and produces steam mainly for power generation. There are many ways to recover waste heat from flue gas of waste heat boiler. Generally, comprehensive utilization of waste heat is followed by direct utilization and indirect utilization. vertical Energy saving steam generator factory Generally speaking, if heat sources are needed in the process, the waste heat utilization is mainly comprehensive utilization. First, the heat source is recovered and fed back to the process for reuse. If there is any surplus, it can be used for power generation or as the heat source for central heating; If there is no surplus, it will be directly used instead of being used for power generation; If the process does not need more heat sources, then indirect use, mainly power generation or public heating.

The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Jinan Energy saving steam generator The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. vertical Energy saving steam generator factory When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

When the boiler is shut down, the temperature of the heat transfer oil can be reduced to below 70 ℃ before the hot oil pump is shut down. In case of sudden power failure, extinguish the fire immediately, and then implement the operating procedures. Otherwise, the furnace tube will be burned out and the loss will be large. According to the type of heat transfer oil boiler, heat transfer oil shall be reasonably selected to prevent overheating. Jinan Energy saving steam generator When purchasing unqualified heat transfer oil, do not save money or mix heat transfer oil indiscriminately. Otherwise, the consequences will be very serious. Prevent the oxidation of heat transfer oil. The strict heat transfer oil is more than 50 degrees in contact with the air, which will make the heat transfer oil crack. Its speed is amazing, and the consequences are relatively serious. After normal operation, the test crew needs to close the exhaust valve on the auxiliary exhaust pipe. After 6 months of use, the heat transfer oil must be sampled and tested according to the instructions. If problems are found, the heat transfer oil must be replaced immediately. vertical Energy saving steam generator factory However, it should be noted that different types of heat transfer oil should not be mixed. The circulation speed of the heat transfer oil should not be less than 1.5m/s. Due to the excessive temperature difference between some entrances and exits, the original design requirements were destroyed, the heat transfer oil could not maintain the original circulation state, the boundary layer became thicker, and the thermal resistance became larger, making the furnace wall exceed the oil film temperature, leading to carbon deposition, cracking, polymerization, coking, and even burning through the furnace tube.

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Jinan Energy saving steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Energy saving steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

It can only be prevented by adding medicine to the pot. Jinan Energy saving steam generator Adding drugs to the boiler can further soften the water quality, making up that the softening water equipment cannot replace silicon, sulfur and heavy metal ions and anions, so that impurities such as suspended solids, water slag and scale in dissolved water have good looseness and fluidity, and then the impurities are discharged by sewage, thus preventing scale. The water treatment method is carried out in the pot, so it is called water treatment method in the pot. vertical Energy saving steam generator factory Therefore, boiler water treatment actually includes water treatment of feed water and quantitative feeding treatment in the boiler. Water treatment should only be carried out without adding drugs. The boiler water index basically does not meet the specified requirements, and the boiler cannot operate under good water quality. This is also the main reason for the softened water device. The softened water is also qualified, and the boiler will also be polluted.

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Jinan Energy saving steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Energy saving steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.