夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Chengdu Vertical Energy saving Steam Generator Factory

2021-06-26
 Chengdu Vertical Energy saving Steam Generator Factory

As a pressure vessel, waste heat boiler shall be used reasonably and managed scientifically in the process of use to avoid safety accidents caused by improper use and management. The quality of water is one of the important factors affecting the service life and safe operation of waste heat boiler. The quality of water added into the boiler directly affects the normal operation of waste heat boiler. Chengdu Energy saving steam generator The normal delivery of water is the lifeblood of normal boiler use. If the boiler is short of water, it is bound to cause major safety accidents and fatal damage to the boiler. Therefore, it is necessary to ensure continuous and stable water transmission during boiler operation. vertical Energy saving steam generator factory Regardless of the tonnage of the waste heat boiler, the lower configuration of the boiler electric control shall ensure the continuous operation of the boiler water pump, and the water supply pipeline shall be equipped with a water supply regulating valve with good regulation characteristics to control the water supply flow according to the level of the boiler. In addition, in order to ensure that the normal delivery of water will not be affected by the pump failure, a standby pump should be ensured.

 Chengdu Vertical Energy saving Steam Generator Factory

Most people may already know something about flue gas waste heat recovery, because they have already explained a lot about it. In order to let you know the relevant knowledge of flue gas waste heat recovery, the following is a brief introduction to the two methods commonly used for recovery. Chengdu Energy saving steam generator Two methods are usually adopted for flue gas waste heat recovery: one is to preheat the workpiece; The other is to preheat air for combustion support. The flue gas preheating workpiece needs to occupy a large volume for heat exchange, which is often limited by the operation site (this method cannot be used for furnaces that are used intermittently). vertical Energy saving steam generator factory Preheating air for combustion support is a good method. It is generally configured on the heating furnace, which can also strengthen combustion, speed up the temperature rise of the furnace, and improve the thermal performance of the furnace. This can not only meet the requirements of the process, but also achieve significant comprehensive energy-saving effect.

 Chengdu Vertical Energy saving Steam Generator Factory

The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Chengdu Energy saving steam generator The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. vertical Energy saving steam generator factory When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

 Chengdu Vertical Energy saving Steam Generator Factory

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Chengdu Energy saving steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Energy saving steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

 Chengdu Vertical Energy saving Steam Generator Factory

Biomass boilers can be roughly divided into two categories according to their uses: one is biomass thermal energy boiler, and the other is biomass electric energy boiler. Chengdu Energy saving steam generator In fact, the principle of the two is basically the same. Both obtain energy by burning biomass fuel, which is just one way to directly obtain heat energy. The second way is to convert heat energy into electric energy. Among the two boilers, one is widely used and has mature technology. If we continue to subdivide, one kind of boiler - biomass heat energy boiler mainly has the following two types: one is small biomass heat energy boiler. vertical Energy saving steam generator factory The boiler uses solidified or gasified biomass fuel to provide heat energy in the form of hot water. Its advantages are small size, simple structure and low price; Class II: medium-sized biomass heat energy boiler. Such boilers mainly use solidified biomass fuel to provide hot water or steam. Its advantages are relatively mature technology, small energy loss and strong heat supply capacity.