夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Shandong Vertical Electric Heating Steam Generator Factory

2021-07-09
 Shandong Vertical Electric Heating Steam Generator Factory

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Shandong Electrically heated steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Electrically heated steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

 Shandong Vertical Electric Heating Steam Generator Factory

The air storage tank in the air source system shall be installed behind the rear cooler, so as to prevent oil vapor and liquid water from gathering in the tank and reduce potential safety hazards as far as possible; The lower temperature of other air stored in the tank can also reduce the volume of the body. Shandong Electrically heated steam generator When connected with screw compressor and other air supply equipment, the air receiver can be installed behind the dryer. At this moment, the air entering the air receiver is dry and there is no condensate in the tank. The air tank is a pressure vessel, and each air tank shall be equipped with safety valve, pressure gauge and other necessary safety supervision equipment. vertical Electrically heated steam generator factory The application and maintenance shall strictly comply with the relevant provisions of pressure vessels; The air tank shall be equipped with a manhole or hand hole for maintenance, and the lower part of the tank shall be equipped with a drain valve, which shall be regularly drained; The air storage tank is usually installed outdoors, so it should be protected from direct sunlight and there should be no high temperature heat source nearby.

 Shandong Vertical Electric Heating Steam Generator Factory

Oil gas boilers have obvious characteristics. The main fuel is oil or gas. According to their functions, they can be divided into steam boilers and hot water boilers. Most of them are designed with large furnaces, with thermal efficiency of more than 98%. At the same time, they also have the characteristics of fully automatic and safe operation. Shandong Electrically heated steam generator Generally speaking, oil and gas boilers adopt excellent boiler body design. WNS horizontal boiler adopts wet back three return structure, which can reduce the exhaust gas temperature and make the boiler thermal efficiency reach more than 90%. Therefore, the combustion efficiency is relatively high, greatly extending its service life. vertical Electrically heated steam generator factory In addition, in the design of oil and gas boiler, there are often hinged front and rear smoke boxes. The maintenance method is simple. Most of them are insulated with light aluminum silicate fiber to reduce heat loss. The external use of all stainless steel plate skin improves the appearance quality. In addition, the oil and gas boiler is equipped with an excellent combustion machine, which greatly improves its stability. The combustion machine has an automatic purging function, It can also prevent deflagration during ignition.

 Shandong Vertical Electric Heating Steam Generator Factory

The hardness of water is mainly formed and expressed by calcium and magnesium, so cation exchange resin (water softener) is generally used to replace Ca2+and Mg2+(the main component forming scale) in the water. With the increase of Ca2+and Mg2+in the resin, the efficiency of the resin to remove Ca2+and Mg2+gradually decreases. Shandong Electrically heated steam generator When the resin absorbs a certain amount of calcium and magnesium ions, it must be regenerated. The regeneration process is to wash the resin layer with salt water in the salt tank to replace the hardness ions on the resin. With the regeneration waste liquid discharged out of the tank, the resin will resume its softening and exchange function. vertical Electrically heated steam generator factory Since the hardness of water is mainly formed by calcium and magnesium and represents that the hardness of water is mainly formed by calcium and magnesium and represents the principle of sodium ion exchange and softening treatment, the principle is to pass raw water through sodium type cation exchange resin, so that the hardness components Ca2+and Mg2+in the water can exchange with the Na+in the resin, thereby adsorbing Ca2+ Mg2+, Soften the water.