夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

How much is the vertical horizontal fuel gas steam generator in Shenyang

2021-07-26
 How much is the vertical horizontal fuel gas steam generator in Shenyang

Diaphragm air pressure tank is an energy storage device composed of a steel shell and a rubber diaphragm liner. The rubber diaphragm completely separates the water chamber from the air chamber. When water with external pressure is filled into the liner of the diaphragm air pressure tank, the air sealed in the diaphragm air pressure tank will be compressed. Shenyang Horizontal fuel gas steam generator According to Boyle's gas law, the volume of gas becomes smaller after being compressed, and the pressure increases to store energy. The expansion of compressed gas can press the water in the rubber diaphragm out of the tank. Diaphragm pressure tank is widely used in central air conditioning, boiler, water heater, frequency conversion and constant pressure water supply equipment. It can buffer the pressure fluctuation of the system and eliminate water hammer to stabilize the pressure and unload the load. vertical Horizontal fuel gas steam generator how much When the water pressure in the system changes slightly, the automatic expansion and contraction of the diaphragm air pressure capsule will have a buffer effect on the change of water pressure, which can ensure the stability of the water pressure in the system, and the water pump will not be opened frequently due to the change of pressure.

 How much is the vertical horizontal fuel gas steam generator in Shenyang

The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Shenyang Horizontal fuel gas steam generator The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. vertical Horizontal fuel gas steam generator how much When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

 How much is the vertical horizontal fuel gas steam generator in Shenyang

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Shenyang Horizontal fuel gas steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Horizontal fuel gas steam generator how much Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

 How much is the vertical horizontal fuel gas steam generator in Shenyang

Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Shenyang Horizontal fuel gas steam generator Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. vertical Horizontal fuel gas steam generator how much The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.