The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Chengdu electric steam generator The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. small-scale electric steam generator how much When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

Effectively prevent and reduce low temperature corrosion of air preheater. Low temperature corrosion is caused by sulfur dioxide generated by combustion of sulfur in fuel. Chengdu electric steam generator Under the action of catalyst, sulfur dioxide is further oxidized to sulfur trioxide. Sulfur trioxide and water vapor in the flue gas generate sulfuric acid vapor, which greatly increases the dew point of the flue gas, condenses the sulfuric acid vapor on the flue gas side of the preheater tube wall, causing sulfuric acid corrosion of the preheater. The content of sulfur trioxide has a great impact on the corrosion rate of the preheater. The content of sulfur trioxide is not only related to the sulfur content in the fuel, but also related to the oxygen content in the flue gas. small-scale electric steam generator how much Low oxygen combustion can significantly reduce the oxygen content in flue gas, greatly reduce the amount of sulfur dioxide oxidized to sulfur trioxide, reduce the dew point of flue gas, and effectively reduce the corrosion of preheater. Low oxygen combustion reduces the amount of flue gas. It can not only reduce the exhaust gas temperature, improve the boiler efficiency, but also reduce the power consumption of the forced draft fan and the wear of the heating surface.

The steam used in the steam generator of the hotel laundry is usually 0.4~0.6MPa saturated steam. The working temperature of steam is not very high. Chengdu electric steam generator The steam boiler of the hotel requires high steam efficiency due to operating costs, so it can save operating costs. The area of the hotel is relatively limited, so the steam boiler with small floor area must be selected. In order to control the investment cost and heat loss of the steam pipe, the steam boiler is usually placed on the side of the laundry room. small-scale electric steam generator how much The steam equipment in the hotel laundry room can only be turned on when washing, not when washing. Therefore, the steam generator is required to start steam production quickly. Laundry equipment is sometimes opened a lot and sometimes less, so the steam boiler is required to adjust the steam volume within the specified range.

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Chengdu electric steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. small-scale electric steam generator how much Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

The long-term use of gas-fired boilers will inevitably lead to problems of one kind or another. However, the working principle of gas-fired boiler is complex, and the price of gas-fired boiler is particularly high, so it is necessary to select high-quality gas-fired boiler manufacturers and companies with good after-sales service. Chengdu electric steam generator In addition, what should we do if the gas boiler fails? As the gas-fired boiler involves the construction of gas and lines, the professional installation personnel of the manufacturer must check the installation at home, and the professional personnel shall install it. Improper installation will bring a series of problems for future use. small-scale electric steam generator how much The existing pipes and radiators in China need to be observed by professional engineers and installation personnel to determine whether they can continue to be used. If the service life is long, the heating system may scale more. It is generally recommended that the user replace it to obtain better heating effect.

The main parts of the waste heat boiler can be divided into drum, pipe, header, membrane wall, tube panel, tube box, etc. These parts are the parts with specific process requirements in the waste heat boiler. Chengdu electric steam generator For example, the drum should go through metal flaw detection, heat treatment, hydrostatic test and other processes to improve the stability of the waste heat boiler. At the same time, because the header needs high sealing, manual welding is required, and the welding quality needs to be tested. It can be seen that due to the complexity of the working environment of the waste heat boiler, it has special requirements for its internal structural members. small-scale electric steam generator how much In the process of designing and manufacturing the waste heat boiler, the process designer should consider the advantages and disadvantages of various processes, and then select a reasonable process to complete the manufacturing of the waste heat boiler. For example, the serpentine parts in the waste heat boiler cannot be bent automatically by the machine, so they can only be bent manually.