After the cold furnace of oil fired and gas fired boiler is ignited, the speed of temperature rise shall be controlled at 10 ℃/hour, mainly because the viscosity of oil temperature is large when it is cold, and the flow rate in the heating surface pipe of the whole equipment is relatively low. Xinxiang Electric steam generator The oil film on the pipe wall is thick, so the heat transfer condition is poor when in use. If the heating speed of oil and gas fired boiler is too fast during use, it is easy to make the local oil film temperature too high. The equipment is in the stage of driving away the residual moisture and moisture contained in the heat conduction fluid in the system within the temperature range. vertical Electric steam generator how much In oil and gas fired boiler, when the steam exhaust volume at the vent pipe of the expander is relatively large, there will be water hammer at the bottom of the equipment. In this way, the vibration of the pipeline will accelerate, and when the swing amplitude of the pressure gauge pointer in each part of the equipment is large, the temperature rise will be stopped and the constant temperature state will be maintained.

Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Xinxiang Electric steam generator Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. vertical Electric steam generator how much The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.

To understand the advantages and disadvantages of hot blast stove and hot water stove, we should start from the working principles of the two boilers. The hot water boiler can increase the indoor temperature by burning hot water, circulating hot water, heat dissipation, etc. General purpose (radiators, floor heating pipes, water heating air conditioners are generally used for heating in families, enterprises and institutions). Xinxiang Electric steam generator The hot blast stove can increase the indoor temperature by heating the air. Generally, a hot channel wind belt is required. It is generally used for workshop, breeding, planting and special heating or drying. Most areas in northern China are cold, such as the three northeastern provinces, Inner Mongolia, Xinjiang and other cities. The colder temperature is more than minus 40 degrees Celsius. There are hot water boilers and steam boilers for heating. Its disadvantage is that it is afraid of circulatory system failure or power failure. vertical Electric steam generator how much Once the power failure exceeds two to three hours, if the insulation is not good, the pipeline will freeze. The heating of hot blast furnace is not frozen, and the temperature can be set. It can save 40% energy than hot water heating and 50% energy than steam boiler heating. This comparison is practical. The hot blast stove does not need to apply for a use certificate, the steam boiler and pressure hot water boiler need to apply for a use certificate, and the functional department also needs to carry out annual inspection every year, but also has to bear the cost.

The existing industrial boiler flue gas waste heat recovery equipment mainly includes tubular heat exchanger and full heat pipe heat exchanger. Tube and tube heat exchanger can be composed of finned tube bundles. The advantage of finned tube is that it can withstand higher temperature, but has low heat transfer coefficient and large floor area. Xinxiang Electric steam generator The flue gas of industrial boilers contains sulfur and other acidic substances. In the low temperature zone (flue gas outlet section), the temperature may be lower than the dew point of the acidic substances. The acidic substances will dew on the pipe wall, corrode the shell of the fin tube. The fin tube heat exchanger has poor operating reliability and low service life. vertical Electric steam generator how much The total heat pipe heat exchanger of boiler flue gas waste heat recovery equipment is composed of heat pipe bundles. Its shell is made of multi-layer composite materials. The heat pipe structure is complex, the cost is relatively expensive, the service life is short, and the steel consumption is large. It is difficult for users to accept it, and it is difficult to promote its application in production. The composite heat pipe heater not only takes into account the heat exchange effect, but also takes into account the economic affordability of the investors in production, which is particularly suitable for the current situation in China's industrial production.

System oil drainage: drain the heat transfer oil in the system when the circulating heat transfer oil is between 120 ± 5 (if the oil is not replaced, please find a clean container for proper storage) Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Xinxiang Electric steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Electric steam generator how much Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.