夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Shanghai Vertical Waste Heat Boiler Plant

2021-09-21
 Shanghai Vertical Waste Heat Boiler Plant

Most people may already know something about flue gas waste heat recovery, because they have already explained a lot about it. In order to let you know the relevant knowledge of flue gas waste heat recovery, the following is a brief introduction to the two methods commonly used for recovery. Shanghai Waste heat boiler Two methods are usually adopted for flue gas waste heat recovery: one is to preheat the workpiece; The other is to preheat air for combustion support. The flue gas preheating workpiece needs to occupy a large volume for heat exchange, which is often limited by the operation site (this method cannot be used for furnaces that are used intermittently). vertical Waste heat boiler factory Preheating air for combustion support is a good method. It is generally configured on the heating furnace, which can also strengthen combustion, speed up the temperature rise of the furnace, and improve the thermal performance of the furnace. This can not only meet the requirements of the process, but also achieve significant comprehensive energy-saving effect.

 Shanghai Vertical Waste Heat Boiler Plant

The hardness of water is mainly formed and expressed by calcium and magnesium, so cation exchange resin (water softener) is generally used to replace Ca2+and Mg2+(the main component forming scale) in the water. With the increase of Ca2+and Mg2+in the resin, the efficiency of the resin to remove Ca2+and Mg2+gradually decreases. Shanghai Waste heat boiler When the resin absorbs a certain amount of calcium and magnesium ions, it must be regenerated. The regeneration process is to wash the resin layer with salt water in the salt tank to replace the hardness ions on the resin. With the regeneration waste liquid discharged out of the tank, the resin will resume its softening and exchange function. vertical Waste heat boiler factory Since the hardness of water is mainly formed by calcium and magnesium and represents that the hardness of water is mainly formed by calcium and magnesium and represents the principle of sodium ion exchange and softening treatment, the principle is to pass raw water through sodium type cation exchange resin, so that the hardness components Ca2+and Mg2+in the water can exchange with the Na+in the resin, thereby adsorbing Ca2+ Mg2+, Soften the water.

 Shanghai Vertical Waste Heat Boiler Plant

To understand the advantages and disadvantages of hot blast stove and hot water stove, we should start from the working principles of the two boilers. The hot water boiler can increase the indoor temperature by burning hot water, circulating hot water, heat dissipation, etc. General purpose (radiators, floor heating pipes, water heating air conditioners are generally used for heating in families, enterprises and institutions). Shanghai Waste heat boiler The hot blast stove can increase the indoor temperature by heating the air. Generally, a hot channel wind belt is required. It is generally used for workshop, breeding, planting and special heating or drying. Most areas in northern China are cold, such as the three northeastern provinces, Inner Mongolia, Xinjiang and other cities. The colder temperature is more than minus 40 degrees Celsius. There are hot water boilers and steam boilers for heating. Its disadvantage is that it is afraid of circulatory system failure or power failure. vertical Waste heat boiler factory Once the power failure exceeds two to three hours, if the insulation is not good, the pipeline will freeze. The heating of hot blast furnace is not frozen, and the temperature can be set. It can save 40% energy than hot water heating and 50% energy than steam boiler heating. This comparison is practical. The hot blast stove does not need to apply for a use certificate, the steam boiler and pressure hot water boiler need to apply for a use certificate, and the functional department also needs to carry out annual inspection every year, but also has to bear the cost.

 Shanghai Vertical Waste Heat Boiler Plant

When the boiler is shut down, the temperature of the heat transfer oil can be reduced to below 70 ℃ before the shutdown of the hot oil pump. In case of sudden power failure, extinguish the fire immediately, and then implement the operating procedures. Otherwise, the furnace tube will be burned out and the loss will be large. According to the type of heat transfer oil boiler, heat transfer oil shall be reasonably selected to prevent overheating. Shanghai Waste heat boiler When purchasing unqualified heat transfer oil, do not save money or mix heat transfer oil indiscriminately. Otherwise, the consequences will be very serious. Prevent the oxidation of heat transfer oil. The strict heat transfer oil is more than 50 degrees in contact with the air, which will make the heat transfer oil crack. Its speed is amazing, and the consequences are relatively serious. After normal operation, the test crew needs to close the exhaust valve on the auxiliary exhaust pipe. After 6 months of use, the heat transfer oil must be sampled and tested according to the instructions. If problems are found, the heat transfer oil must be replaced immediately. vertical Waste heat boiler factory However, it should be noted that different types of heat transfer oil should not be mixed. The circulation speed of the heat transfer oil should not be less than 1.5m/s. Due to the excessive temperature difference between some entrances and exits, the original design requirements were destroyed, the heat transfer oil could not maintain the original circulation state, the boundary layer became thicker, and the thermal resistance became larger, making the furnace wall exceed the oil film temperature, leading to carbon deposition, cracking, polymerization, coking, and even burning through the furnace tube.