Jiangsu Vertical Energy saving Steam Generator Factory

2021-11-11
 Jiangsu Vertical Energy saving Steam Generator Factory

Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Jiangsu Energy saving steam generator Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. vertical Energy saving steam generator factory The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.

 Jiangsu Vertical Energy saving Steam Generator Factory

System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Jiangsu Energy saving steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Energy saving steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

 Jiangsu Vertical Energy saving Steam Generator Factory

The steam used in the steam generator of the hotel laundry is usually 0.4~0.6MPa saturated steam. The working temperature of steam is not very high. Jiangsu Energy saving steam generator The steam boiler of the hotel requires high steam efficiency due to operating costs, so it can save operating costs. The area of the hotel is relatively limited, so the steam boiler with small floor area must be selected. In order to control the investment cost and heat loss of the steam pipe, the steam boiler is usually placed on the side of the laundry room. vertical Energy saving steam generator factory The steam equipment in the hotel laundry room can only be turned on when washing, not when washing. Therefore, the steam generator is required to start steam production quickly. Laundry equipment is sometimes opened a lot and sometimes less, so the steam boiler is required to adjust the steam volume within the specified range.

 Jiangsu Vertical Energy saving Steam Generator Factory

Diaphragm air pressure tank is an energy storage device composed of a steel shell and a rubber diaphragm liner. The rubber diaphragm completely separates the water chamber from the air chamber. When water with external pressure is filled into the liner of the diaphragm air pressure tank, the air sealed in the diaphragm air pressure tank will be compressed. Jiangsu Energy saving steam generator According to Boyle's gas law, the volume of gas becomes smaller after being compressed, and the pressure increases to store energy. The expansion of compressed gas can press the water in the rubber diaphragm out of the tank. Diaphragm pressure tank is widely used in central air conditioning, boiler, water heater, frequency conversion and constant pressure water supply equipment. It can buffer the pressure fluctuation of the system and eliminate water hammer to stabilize the pressure and unload the load. vertical Energy saving steam generator factory When the water pressure in the system changes slightly, the automatic expansion and contraction of the diaphragm air pressure capsule will have a buffer effect on the change of water pressure, which can ensure the stability of the water pressure in the system, and the water pump will not be opened frequently due to the change of pressure.