夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Jilin Vertical Waste Heat Boiler Plant

2021-11-24
 Jilin Vertical Waste Heat Boiler Plant

The waste heat boiler greatly improves the utilization rate of heat released by fuel combustion, so this kind of boiler saves energy; Fuel oil, gas and coal combustion generate high-temperature flue gas to release heat. The high-temperature flue gas first enters the furnace, then enters the waste heat recovery device of the front smoke box, then enters the pyrotechnic tube, and then enters the waste heat recovery device in the flue of the rear smoke box. The high-temperature flue gas turns into low-temperature flue gas and is discharged into the atmosphere through the chimney. Jilin Waste heat boiler Conditions conducive to quick startup of waste heat boiler: (1) The waste heat boiler adopts forced circulation, which has the priority of quick startup. (2) The flue gas baffle is hydraulically controlled, which can be used to adjust the sky in principle. The flue gas flow into the boiler is reduced. (3) The adjustable guide vane at the inlet of gas turbine can not only adjust the flue gas flow of gas turbine, but also increase or decrease the exhaust gas temperature of gas turbine through the selection of IGV temperature control mode. (4) The steam turbine bypass is designed for the rated evaporation capacity of the boiler. (5) The welded bends and headers of each heating module of the boiler are in the boiler. (6) Similar boilers in other gas turbine power plants can not be reduced when starting, and can be used to adjust the main steam pressure of the boiler. Outside the wall, contact with high-temperature smoke is avoided. vertical Waste heat boiler factory Operating experience of gas turbine load, such as simultaneous startup of gas turbine and waste heat boiler (flue gas damper fully open). Under the possibility of quick startup of waste heat boiler, the water level of steam drum and deaerator will lose control after the flue gas baffle is opened.

 Jilin Vertical Waste Heat Boiler Plant

The air storage tank in the air source system shall be installed behind the rear cooler, so as to prevent oil vapor and liquid water from gathering in the tank and reduce potential safety hazards as far as possible; The lower temperature of other air stored in the tank can also reduce the volume of the body. Jilin Waste heat boiler When connected with screw compressor and other air supply equipment, the air receiver can be installed behind the dryer. At this moment, the air entering the air receiver is dry and there is no condensate in the tank. The air tank is a pressure vessel, and each air tank shall be equipped with safety valve, pressure gauge and other necessary safety supervision equipment. vertical Waste heat boiler factory The application and maintenance shall strictly comply with the relevant provisions of pressure vessels; The air tank shall be equipped with a manhole or hand hole for maintenance, and the lower part of the tank shall be equipped with a drain valve, which shall be regularly drained; The air storage tank is usually installed outdoors, so it should be protected from direct sunlight and there should be no high temperature heat source nearby.

 Jilin Vertical Waste Heat Boiler Plant

Effectively prevent and reduce low temperature corrosion of air preheater. Low temperature corrosion is caused by sulfur dioxide generated by combustion of sulfur in fuel. Jilin Waste heat boiler Under the action of catalyst, sulfur dioxide is further oxidized to sulfur trioxide. Sulfur trioxide and water vapor in the flue gas generate sulfuric acid vapor, which greatly increases the dew point of the flue gas, condenses the sulfuric acid vapor on the flue gas side of the preheater tube wall, causing sulfuric acid corrosion of the preheater. The content of sulfur trioxide has a great impact on the corrosion rate of the preheater. The content of sulfur trioxide is not only related to the sulfur content in the fuel, but also related to the oxygen content in the flue gas. vertical Waste heat boiler factory Low oxygen combustion can significantly reduce the oxygen content in flue gas, greatly reduce the amount of sulfur dioxide oxidized to sulfur trioxide, reduce the dew point of flue gas, and effectively reduce the corrosion of preheater. Low oxygen combustion reduces the amount of flue gas. It can not only reduce the exhaust gas temperature, improve the boiler efficiency, but also reduce the power consumption of the forced draft fan and the wear of the heating surface.

 Jilin Vertical Waste Heat Boiler Plant

System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Jilin Waste heat boiler Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Waste heat boiler factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.