夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Jilin Vertical Steam Generator Plant

2021-12-17
 Jilin Vertical Steam Generator Plant

What are the main applications of electric heating heat conduction oil boiler and steam generator in ironing industry, biochemical industry, school experimental heat source, food processing and other clothing industries? Jilin Steam generator Next, the manufacturer of heat conduction oil furnace will explain it to you. Low carbon emissions: even if coal is used as power generation energy, energy loss and vehicle pollution during coal transportation can be saved and reduced by promoting and improving the scale and intensity of coal power generation, so as to reduce carbon emissions as a whole and enhance the low-carbon performance of energy use. Low carbon life: ergonomically designed, it relates to an electric heating system represented by radiators, air conditioners and radiators and a wire heating system represented by heating cables. vertical Steam generator factory The new generation of electric boiler heating system represented by electric boiler is more suitable for people's living needs in the activity space. Low carbon economy: China vigorously develops energy conservation and power generation at low ebb. The general use and promotion of this heating method has directly promoted the strict inspection and lowering of 65% of China's statutory energy saving standards, thus promoting the development of low-carbon buildings in China. Low carbon energy: clean and renewable heating energy. In terms of coal, natural gas, straw, wood and other energy sources, electric energy is one of the promising hot energy sources. With the rise of solar energy, wind energy, hydropower, nuclear energy and other new energy sources, it is booming.

 Jilin Vertical Steam Generator Plant

When using stainless steel storage tank, cracks appear on the head. If it is not handled in time, it will be dangerous, and how to handle this situation will be explained. Jilin Steam generator Firstly, the cracks in the stainless steel tank can were removed by polishing. After grinding, pits that do not need repair welding and do not affect the grading shall be formed within the allowable range. Otherwise, repair welding shall be carried out. The position of surface crack defect shall be determined by surface penetration defect detection, and the welding repair shall be completed. The horizontal gas tank shall be repaired, and the weld and surrounding materials shall be repaired. After that, argon tungsten arc welding shall be used for repair welding. vertical Steam generator factory Tungsten argon arc welding shall be adopted for welding repair. It is suitable for back welding or skip welding, small size multi-layer and multi pass non rotating welding to avoid overheating of the weld. Water cooling measures are adopted. The defects of stainless steel storage tanks shall be removed by grinding with angular grinding wheel with conical grinding rod. Note that the abrasive grains of the grinding wheel should be perpendicular to the crack length. If the defect is deep, crack stop holes shall be drilled at both ends of the defect to prevent the crack from expanding with the grinding process. According to the inspection, in the stainless steel storage tank with primary side inspection, there are cracks at the head welds, and these defective welds have different edge bite degrees. Do not panic when the stainless steel tank can has cracks. The oil tank works. The above measures can be taken to solve this problem.

 Jilin Vertical Steam Generator Plant

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Jilin Steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

 Jilin Vertical Steam Generator Plant

System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Jilin Steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Steam generator factory Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.

 Jilin Vertical Steam Generator Plant

Biomass boilers need green new energy. Compared with other boilers, biomass boilers have the following four major advantages: one boiler is multi-purpose, and can cook, boil water, and bathe while heating. Strong conversion system, low starting heat transfer temperature and fast heat transfer speed. Jilin Steam generator Low installation cost, safe heating: the equipment is universal, without changing the original heating equipment, and the pipes and radiators are universal. Water circulation is used to achieve a wide range of heating materials, which will never be exhausted. It can be taken everywhere (such as rice husks, corn stalks, rice stalks, wheat). Safety and environmental protection: low working pressure, cooking, water boiling, bathing, heating, etc., and it is also suitable for burning boilers, greenhouse heating Large area heating and small and medium-sized hotels can be used all year round without seasonal restrictions. vertical Steam generator factory The reason why the ignition of biomass boiler is difficult is that the stable small fire signal cannot be established, which is caused by the failure of the small fire detector to detect the fire normally. The flame detector for small fire is ionization type flame detector, which requires a contact area with the flame, stable flame size, and gas pressure controlled within a strict range.