The boiler adopts the combustion equipment suitable for the combustion of biomass fuel - reciprocating grate. In the structural design of the boiler, the furnace space of the boiler is larger than that of the traditional boiler, and the reasonable arrangement of the secondary air is conducive to the full combustion of a large amount of volatile matter released instantaneously during the combustion of biomass fuel. The boiler can be equipped with oil (gas) ignition burner to realize ignition automation. Tianjin Horizontal gas steam generator The feeding, combustion, slag removal, water supply and ignition of the boiler can be automatically controlled, and the operation is convenient. The boiler is equipped with an automatic ash cleaning device, which can remove the ash on the heating surface of the boiler in time to ensure the efficient and stable operation of the boiler. The tail of the boiler is equipped with an economizer, or an air preheater according to the user's needs. Compared with the traditional boiler, the boiler has higher efficiency and lower exhaust gas temperature. High efficiency thermal insulation materials are used, the boiler surface temperature is low, and the heat dissipation loss can be ignored. vertical Horizontal gas steam generator manufactor All pressure parts are made of excellent boiler steel in strict accordance with Chinese national codes and standards. Each boiler shall be strictly inspected and tested before leaving the factory, including hydrostatic test and X-ray inspection. Manholes, inspection doors, fire observation holes, etc. are set to facilitate maintenance. The major characteristics of biomass boiler are: energy conservation, environmental protection, and easy installation and use.
System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Tianjin Horizontal gas steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. vertical Horizontal gas steam generator manufactor Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.
After the cold furnace of oil fired and gas fired boiler is ignited, the speed of temperature rise shall be controlled at 10 ℃/hour, mainly because the viscosity of oil temperature is large when it is cold, and the flow rate in the heating surface pipe of the whole equipment is relatively low. Tianjin Horizontal gas steam generator The oil film on the pipe wall is thick, so the heat transfer condition is poor when in use. If the heating speed of oil and gas fired boiler is too fast during use, it is easy to make the local oil film temperature too high. The equipment is in the stage of driving away the residual moisture and moisture contained in the heat conduction fluid in the system within the temperature range. vertical Horizontal gas steam generator manufactor In oil and gas fired boiler, when the steam exhaust volume at the vent pipe of the expander is relatively large, there will be water hammer at the bottom of the equipment. In this way, the vibration of the pipeline will accelerate, and when the swing amplitude of the pressure gauge pointer in each part of the equipment is large, the temperature rise will be stopped and the constant temperature state will be maintained.
The main parts of the waste heat boiler can be divided into drum, pipe, header, membrane wall, tube panel, tube box, etc. These parts are the parts with specific process requirements in the waste heat boiler. Tianjin Horizontal gas steam generator For example, the drum should go through metal flaw detection, heat treatment, hydrostatic test and other processes to improve the stability of the waste heat boiler. At the same time, because the header needs high sealing, manual welding is required, and the welding quality needs to be tested. It can be seen that due to the complexity of the working environment of the waste heat boiler, it has special requirements for its internal structural members. vertical Horizontal gas steam generator manufactor In the process of designing and manufacturing the waste heat boiler, the process designer should consider the advantages and disadvantages of various processes, and then select a reasonable process to complete the manufacturing of the waste heat boiler. For example, the serpentine parts in the waste heat boiler cannot be bent automatically by the machine, so they can only be bent manually.