What are the main applications of electric heating heat conduction oil boiler and steam generator in ironing industry, biochemical industry, school experimental heat source, food processing and other clothing industries? Guizhou Natural gas steam generator Next, the manufacturer of heat conduction oil furnace will explain it to you. Low carbon emissions: even if coal is used as power generation energy, energy loss and vehicle pollution during coal transportation can be saved and reduced by promoting and improving the scale and intensity of coal power generation, so as to reduce carbon emissions as a whole and enhance the low-carbon performance of energy use. Low carbon life: ergonomically designed, it relates to an electric heating system represented by radiators, air conditioners and radiators and a wire heating system represented by heating cables. vertical Natural gas steam generator how much The new generation of electric boiler heating system represented by electric boiler is more suitable for people's living needs in the activity space. Low carbon economy: China vigorously develops energy conservation and power generation at low ebb. The general use and promotion of this heating method has directly promoted the strict inspection and lowering of 65% of China's statutory energy saving standards, thus promoting the development of low-carbon buildings in China. Low carbon energy: clean and renewable heating energy. In terms of coal, natural gas, straw, wood and other energy sources, electric energy is one of the promising hot energy sources. With the rise of solar energy, wind energy, hydropower, nuclear energy and other new energy sources, it is booming.
The main parts of the waste heat boiler can be divided into drum, pipe, header, membrane wall, tube panel, tube box, etc. These parts are the parts with specific process requirements in the waste heat boiler. Guizhou Natural gas steam generator For example, the drum should go through metal flaw detection, heat treatment, hydrostatic test and other processes to improve the stability of the waste heat boiler. At the same time, because the header needs high sealing, manual welding is required, and the welding quality needs to be tested. It can be seen that due to the complexity of the working environment of the waste heat boiler, it has special requirements for its internal structural members. vertical Natural gas steam generator how much In the process of designing and manufacturing the waste heat boiler, the process designer should consider the advantages and disadvantages of various processes, and then select a reasonable process to complete the manufacturing of the waste heat boiler. For example, the serpentine parts in the waste heat boiler cannot be bent automatically by the machine, so they can only be bent manually.
Most softened water equipment can only slow down the scale growth rate, but can not achieve the purpose of scale prevention. The water quality used by different users varies greatly in different regions. Guizhou Natural gas steam generator In some construction sites, steam generators are used for steam maintenance of bridges because tap water cannot be used due to conditions. Only groundwater or river water can be used. At present, the hardness of many groundwater in China exceeds the standard, and the total hardness of water in some areas is high. vertical Natural gas steam generator how much It can reach several hundred millimoles, which is quite serious. I think the use of water softener is basically ineffective, because ordinary resin exchange water softener can only affect water with hardness of 7, which also ensures the use process. It needs to be cured regularly.
The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Guizhou Natural gas steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Natural gas steam generator how much When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.