夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Chengdu Vertical Horizontal Steam Generator Plant

2022-01-28
 Chengdu Vertical Horizontal Steam Generator Plant

The steam used in the steam generator of the hotel laundry is usually 0.4~0.6MPa saturated steam. The working temperature of steam is not very high. Chengdu Horizontal steam generator The steam boiler of the hotel requires high steam efficiency due to operating costs, so it can save operating costs. The area of the hotel is relatively limited, so the steam boiler with small floor area must be selected. In order to control the investment cost and heat loss of the steam pipe, the steam boiler is usually placed on the side of the laundry room. vertical Horizontal steam generator factory The steam equipment in the hotel laundry room can only be turned on when washing, not when washing. Therefore, the steam generator is required to start steam production quickly. Laundry equipment is sometimes opened a lot and sometimes less, so the steam boiler is required to adjust the steam volume within the specified range.

 Chengdu Vertical Horizontal Steam Generator Plant

Most people may already know something about flue gas waste heat recovery, because they have already explained a lot about it. In order to let you know the relevant knowledge of flue gas waste heat recovery, the following is a brief introduction to the two methods commonly used for recovery. Chengdu Horizontal steam generator Two methods are usually adopted for flue gas waste heat recovery: one is to preheat the workpiece; The other is to preheat air for combustion support. The flue gas preheating workpiece needs to occupy a large volume for heat exchange, which is often limited by the operation site (this method cannot be used for intermittent furnaces). vertical Horizontal steam generator factory Preheating air for combustion support is a good method. It is generally configured on the heating furnace, which can also strengthen combustion, speed up the temperature rise of the furnace, and improve the thermal performance of the furnace. This can not only meet the requirements of the process, but also achieve significant comprehensive energy-saving effect.

 Chengdu Vertical Horizontal Steam Generator Plant

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Chengdu Horizontal steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. vertical Horizontal steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

 Chengdu Vertical Horizontal Steam Generator Plant

The waste heat boiler for hazardous waste incineration is an important part of the hazardous waste rotary kiln incineration system. The heat source is the high-temperature waste gas containing strongly coking and cohesive ash after hazardous waste incineration. Chengdu Horizontal steam generator Generally, this type of waste heat boiler adopts single flue or multi flue layout, and convection heating surface is arranged in the flue. During operation, strongly coking cohesive ash is easy to adhere to the convection heating surface, leading to flue blockage, affecting the safe and normal operation of the waste heat boiler. According to the characteristics of hazardous waste rotary kiln incineration system, a kind of waste heat boiler with special structure suitable for the system was developed, which successfully solved the problems of ash deposition, wear, air leakage, corrosion, etc. vertical Horizontal steam generator factory The water circulation mode of the waste heat boiler is natural circulation. The working medium directly enters the drum, then is led out from the drum, flows into each membrane water wall through the downcomer, is heated here, then led back to the drum through the steam conduit, and is separated by the steam water separator, and then led out of the drum saturated steam with rated parameters.