The steam generator pressure controller is used to control the generator, because it has no water level display, no board control, and its heating control is mainly controlled by the floating water level controller. Heilongjiang Horizontal gas steam generator When the water level is moderate, the floating point is connected to the control voltage to operate and heat the AC contactor. The generator has a simple structure and is currently used in the market. The common non heating fault of this generator is mainly found in the float level controller. First check the external wiring of the float level controller, connect the upper and lower control lines, and then remove the float level controller to see if it is flexible. small-scale Horizontal gas steam generator manufactor You can use the manual to use the meter to determine whether the upper control point and the lower control point can be connected. Check the equipment and check for water. The float can fill the fuel tank, replace the float, and eliminate faults.
Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Heilongjiang Horizontal gas steam generator Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. small-scale Horizontal gas steam generator manufactor The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.
Most softened water equipment can only slow down the scale growth rate, but can not achieve the purpose of scale prevention. The water quality used by different users varies greatly in different regions. Heilongjiang Horizontal gas steam generator In some construction sites, steam generators are used for steam maintenance of bridges because tap water cannot be used due to conditions. Only groundwater or river water can be used. At present, the hardness of many groundwater in China exceeds the standard, and the total hardness of water in some areas is high. small-scale Horizontal gas steam generator manufactor It can reach several hundred millimoles, which is quite serious. I think the use of water softener is basically ineffective, because ordinary resin exchange water softener can only affect water with hardness of 7, which also ensures the use process. It needs to be cured regularly.
System oil drainage: circulate the heat transfer oil between 120 ± 5 to drain the heat transfer oil in the system (if you do not replace the oil, please find a clean container to store it properly). Prepare an appropriate amount of coke removal cleaning agent for the heat transfer oil system, drain the oil in the gas-fired heat transfer oil boiler system, and disconnect the cleaning system from the oil storage tank (close the valve), including the connection between the high-level tank and the oil storage tank. Heilongjiang Horizontal gas steam generator Residual oil blowing steps: connect the air compressor at the pressure gauge or other places that can be connected, boost the system to 0.3-0.4MPa, and discharge it instantaneously; Repeat this process until the residual oil is blown out. The gas-fired heat transfer oil boiler, circulating pump, and other heat users form a cleaning circulating circuit for decoking and cleaning: add diluted cleaning agent to the system and fill it up to 1/2 of the water level of the high-level tank. Dosage of coke removal cleaning agent: 10~20%, the specific dosage shall be determined according to the scale thickness. Temperature: 90-95, time: 12-72 hours, which can be determined according to the scale thickness. Rinsing and cleaning: after cleaning, drain the residual liquid in the system and add clean water to rinse twice until the coke remover is free of foam and the water is clear. small-scale Horizontal gas steam generator manufactor Temperature: 85-95, time: 5-8 hours Water blowing steps: after cleaning, connect the air compressor at the pressure gauge or other places that can be connected, use compressed air to boost the system to 0.3-0.4 MPa, and vent at each low point. Repeat this process until the water is blown out. Waste liquid treatment: the cleaning waste liquid generated in the cleaning process is discharged after being treated in the biochemical tank.