LNG Gas filling station
LNG The storage tank of the gas station is the main body, the cryogenic liquid pump, the dispenser and other combined modules, according to GB50156-2002 The first, second and third level standard stations developed and designed in the Code for Design and Construction of Automobile Gas Filling Stations have reasonable process, standard layout, brief introduction, and large limit skidding, factory pre assembly, and small on-site quantities, which are suitable for medium and large-scale gas filling needs.
Gas station level | Basic configuration | Gas filling capacity × ten four Nm ³ |
Number of storage tanks | Number of cryogenic pumps | Number of gas vending machines |
Tertiary station | one × 60m ³ | one | two | 1.5-2 |
two | two | 2-3 |
Secondary station | two × 60m ³ | two | two | 2-3 |
two | four | 3-4 |
Primary station | three × 60m ³ | three | four | 4-5 |
4-8 | 6-8 | 6-8 |
Natural gas station construction / Petrochemical pipeline construction / Gas pipeline construction
General contracting of gas engineering / Special construction of gas engineering
The company has GC2 、 GC3 Pressure pipeline design and installation qualification can provide customers with overall pressure pipeline solutions;
The one-stop service of pressure pipeline design, installation, inspection, certificate handling, transformation and maintenance can quickly and safely solve problems for users, so that users can feel relieved, relieved and comfortable.