How does the manufacturer debug the 0.5t gas steam generator?
2020-10-12
Before commissioning of steam generator, relevant accessories and pipes shall be inspected, and then water supply shall be carried out. Before water inlet, the drain valve must be closed, and all air valves must be opened for air exhaust. When the burner is turned on, the burner enters the program control, and automatically realizes purging, ignition, flameout protection, etc. For burner load adjustment and steam pressure adjustment, refer to the electrical control principle manual of steam generator. With cast iron province
Learn more+