夜上海最新论坛

 //pinpaicloud.cn/data/upload/202006/20200606175354_603.jpg
Your current location: home page > Hot information

Jiangsu Small Natural Gas Steam Generator Plant

2021-08-27
 Jiangsu Small Natural Gas Steam Generator Plant

As a large equipment, the maintenance of gas-fired hot blast stove is one of the things that must be done. Jiangsu Natural gas steam generator Regular maintenance can not only keep the hot blast stove clean, but also improve the service life of the hot blast stove. Therefore, it is the top priority in the use of hot blast stove. Today's editor will tell you how to maintain the hot blast stove regularly. In many manufacturers that use hot blast stoves, in order to better develop the enterprise, it is necessary to increase the number of hot blast stoves and improve the performance of hot blast stoves. small-scale Natural gas steam generator factory When enterprises purchase hot blast stove equipment, they must understand their own needs and the products of hot blast stove manufacturers in the market. Therefore, the small edition of gas-fired hot blast stove tells us the problems to be considered in the selection of hot blast stove.

 Jiangsu Small Natural Gas Steam Generator Plant

To understand the advantages and disadvantages of hot blast stove and hot water stove, we should start from the working principles of the two boilers. The hot water boiler can increase the indoor temperature by burning hot water, circulating hot water, heat dissipation, etc. General purpose (radiators, floor heating pipes, water heating air conditioners are generally used for heating in families, enterprises and institutions). Jiangsu Natural gas steam generator The hot blast stove can increase the indoor temperature by heating the air. Generally, a hot channel wind belt is required. It is generally used for workshop, breeding, planting and special heating or drying. Most areas in northern China are cold, such as the three northeastern provinces, Inner Mongolia, Xinjiang and other cities. The colder temperature is more than minus 40 degrees Celsius. There are hot water boilers and steam boilers for heating. Its disadvantage is that it is afraid of circulatory system failure or power failure. small-scale Natural gas steam generator factory Once the power failure exceeds two to three hours, if the insulation is not good, the pipeline will freeze. The heating of hot blast furnace is not frozen, and the temperature can be set. It can save 40% energy than hot water heating and 50% energy than steam boiler heating. This comparison is practical. The hot blast stove does not need to apply for a use certificate, the steam boiler and pressure hot water boiler need to apply for a use certificate, and the functional department also needs to carry out annual inspection every year, but also has to bear the cost.

 Jiangsu Small Natural Gas Steam Generator Plant

The manufacturer of the pneumatic water tank shall hold the pressure vessel manufacturing license or registration, and have a sound quality management system and system. Jiangsu Natural gas steam generator The purchased parts of the equipment must have the product certificate and pass the entrance inspection before use. The pneumatic water tank, water pump unit, electrical components and other components of the three-dimensional elastic filler manufacturer's equipment shall be assembled and used after passing the inspection. The equipment assembled on site can be used to inspect the performance of the whole machine on site. The production license issued by the relevant department shall be held. small-scale Natural gas steam generator factory When selecting this product, requirements shall be put forward for the following items: equipment composition, equipment classification, equipment working pressure, equipment design flow, specification and quantity of air pressure tank, equipment data, and sanitary requirements. The overall structure of equipment, water pipe, gas pipe and electrical circuit shall be arranged reasonably, and the manufacturer of single hole mold aerator shall reserve space for device maintenance to facilitate operation. The pipeline of the equipment shall be equipped with a safety valve, and the opening pressure of the combined packing manufacturer shall not be greater than 1.1 times of the working pressure. The equipment shared by fire fighting and living (production) shall have a separate fire water outlet.

 Jiangsu Small Natural Gas Steam Generator Plant

The starting of gas-fired boiler shall be carried out according to the operating procedures. The following is the accurate starting process of the analyzed gas-fired boiler: turn on the main power supply, start the gas-fired incinerator, and close the vent valve on the drum when it emits steam. Jiangsu Natural gas steam generator Check the manhole, handhole flange and valve of the gas boiler. If any leakage is found, fasten them. If leakage occurs after fastening, shut down the boiler for maintenance. When the gas pressure of the gas boiler rises by 0.05~0.1MPA, make up water, blow down, check the experimental water supply system and blow down equipment, and flush the water level gauge together. When the gas boiler pressure rises to 0.1~0.15MPA, flush the pressure gauge trap; When the gas pressure of the gas-fired boiler rises to 0.3MPA, turn the "load high fire/low fire" knob to "high fire" to strengthen incineration. When the pressure of the boiler rises to 2/3 of the operating pressure, start pipe warming and air supply, slowly open the main steam valve to prevent water hammer. small-scale Natural gas steam generator factory When the drain valve emits steam, close it. After all the drain valves are closed, slowly open the main gas valve to fully open, and then reverse it for half a circle. Turn the "Control of gas incinerator" knob to the automatic gear.

 Jiangsu Small Natural Gas Steam Generator Plant

Inspection and use preparation of oil and gas boiler. Inspection of the furnace and flue, and the soot and sundries in the furnace and flue shall be removed. Jiangsu Natural gas steam generator Check the boiler accessories to see if they are in good condition; Whether the cock can rotate easily; Whether the instruments and control devices are in good condition and clean. After inspection, the pressure gauge cock shall be in working condition. Check the automatic control system. Check the auxiliary equipment of oil and gas boiler. Check the combustion equipment to see if the combustion equipment is in good condition; For mechanical transmission system, coal handling system and ballast system, the test steering is normal; The spring of the gearbox shall be properly compressed and lubricated; The indication of coal door gauge is correct. small-scale Natural gas steam generator factory The eagle iron is neat and complete, and the ballast plate is complete. Check the heating surface and ensure that the equipment coupling is firmly connected; V-belt is loose properly; The lubricating oil is in good condition; The cooling water is smooth. After passing the test, install the protective cover, test run separately, and pay attention to the current during idling.