Electrically heated steam generator Its use is environmentally friendly and efficiency is guaranteed. Compared with traditional boilers, it is more convenient to operate and helps our production efficiency. Generally, the equipment that is maintained regularly according to the operating specifications will not fail. But sometimes because the staff do not look at the water level and supplement water in time, the equipment is short of water. What should we do now?
When electric heating Steam generator If the water level can not be seen from the water level gauge, and the position of the water connecting pipe of the water level gauge is lower than the high fire boundary in case of water shortage, emergency shutdown shall be carried out immediately to reduce the furnace temperature and close the feed water valve and main steam valve. For boilers with large water capacity and water connecting pipe position higher than the high fire boundary of the boiler, the "water calling" method can be used to determine the degree of water shortage so as to take corresponding measures. The method of "calling water" specifically refers to: (1) open the drain cock of the water gauge; (2) close the steam cock; (3) close the water cock; (4) close the drain cock again; (5) Then open the water cock to see if there is water rushing out from the water pipe. If there is water rushing out, it is a slight water shortage; if there is no water level rising, it is a serious water shortage. It should be reminded that after the electric heating steam generator is missing, it is necessary to first judge whether it is a serious water shortage. It is strictly prohibited to add water blindly. This may not solve the problem, but may cause major events in the same place, Therefore, every staff member should have the common sense to deal with emergencies in order to deal with the occurrence of sudden situations.
In addition, as a kind of steam equipment, users hope that the equipment can operate for a long time. Therefore, in the process of use, in addition to standardized operation, they should also pay attention to its daily maintenance. As the saying goes, take precautions. What is introduced to you is what parts of the equipment need to be repaired: the furnace, and the sundries in the furnace should be cleaned. The air duct regulating valve and gate shall be complete and tight, with accurate opening and closing indication and flexible opening and closing. Electrically heated steam generator The inspection of accessories depends on whether the safety accessories are in good condition, whether the cock rotates flexibly, and all kinds of control devices and instruments should be complete and kept clean. After passing the inspection, the pressure gauge cock shall be in working condition. Inspection of auxiliary equipment and automatic control system. Inspection of heating equipment. Check whether the heating device is in good condition; The safety spring of the speed governing box shall be properly compressed and well lubricated.