We know Vertical electric heating steam generator It is a device that heats the medium water to obtain the pressure steam by the electrified electric heating element. It is used in industries and places requiring pressure steam such as laundry, clothing, food, leather making, chemical fiber, textile, etc. Electric steam generator It has the advantages of simple maintenance, no noise, no flame, no smoke, no pollution, small floor area, safe use, convenient operation, high degree of automation, beautiful appearance, etc. They also need to master the methods of daily maintenance.
Safety valve
1. Calibrate at least once a year.
2. It is forbidden to adjust the set pressure of the safety valve.
3. There should be no resistance at the outlet to avoid pressure.
4. Keep clean to prevent valve body and spring from being stuck or rusted by oil stain, dirt
Corrosion to prevent oil stain or other foreign matters from blocking the drain pipe;
probe
1. The probe must be scrubbed every two to three months.
2. If the water quality in the use area is poor, it should be cleaned once half a month,
Blowdown
1. This operation is more important. Blowdown can delay the generation of scale and the deposition of furnace wall, and can extend the service life of equipment.
2. Blowdown under pressure (0.1-0.2MP) at least once a day, and water must be stored in the empty boiler after the work is completed
3. The principle of sewage discharge is: frequent discharge, less discharge and even discharge. The time interval of each sewage discharge shall be generally balanced, and the sewage discharge shall be carried out in short intervals. Blowdown of blow down valve
The time is usually 20-30s.
3. During blowdown, the blowdown valve shall be opened and closed immediately after opening, and repeated 2-3 times. In order to attract the scale and slag to quickly flow into the sewage outlet, and make the water flow form a shock, strengthen the sewage effect, and pay attention to that the sewage outlet should not face people.
Other precautions:
When the equipment stops running for a long time, the power supply shall be cut off, and the water in the equipment pipeline shall be drained to prevent freezing, rust and other phenomena. When the equipment is not used at ordinary times, cut off the power supply, open the electric control box, check the connecting terminals of all electrical parts, and tighten the loose fasteners to prevent the scorching of wires and electrical components due to poor contact.
Note: The electric control box shall not contain water or steam or flammable and explosive gases. The door of the electric control box must be closed when the equipment is running. If you want to know more about vertical Electrically heated steam generator You can browse our website and we will provide you with more information.