Fuel gas Steam generator equipment Vertical internal combustion flame tube Steam generator 。 The high-temperature flue gas generated by the combustion of the burner is washed from the bottom into the return flue gas duct in turn, and then discharged into the atmosphere from the lower flue gas chamber and the three return flue gas ducts through the chimney. The steam generator is equipped with an industrial burner with good technical performance, which adopts excellent technologies such as automatic combustion proportional regulation, automatic feed water regulation, program start stop, and fully automatic operation, and has automatic protection functions such as high and low water level alarm, low water level, ultra-high steam pressure, and flameout. This type of steam generator has the characteristics of compact structure, equivalent, simple operation, rapid installation, less pollution, low noise and high efficiency. Pay attention to the following items during the operation of fuel gas steam generator:
1. Before using the fuel gas steam generator, carefully read the boiler operating instructions to ensure the correct use and maintenance of the equipment.
2. Open the steam valve before daily operation, and then open the blowdown valve until the water and dirt in the boiler are completely discharged.
3. Check the water tank to ensure that there are no sundries in the water tank, otherwise the water pump will be damaged or the check valve will be stuck.
4. Close the blow down valve and the steam valve is still open. Start the power switch of the evaporator, and a water shortage alarm will be sent at this time. The water valve will operate to replenish water to the evaporator until the water level in the boiler is higher than the low water level, and the alarm will stop. When the water level reaches the high water level, the water pump will stop replenishing water.
5。 When the evaporator enters the normal working state, the steam valve can be closed, and the evaporator starts to slowly increase pressure. When the steam pressure rises to the set pressure, the heating will stop automatically. At this time, steam can be used normally.
6. The fuel gas steam generator shall blow down at least once a day. After the work is completed every day, the power supply shall be cut off for 15 minutes (or the electric heating tube will be burnt) and the pressure shall be reduced to 0.05Mpa for blow down. Pay attention to safety during blow down to prevent burns.
7. Check the time of water treatment twice a day to see if it is consistent with the actual time, otherwise it should be adjusted. Once the time of salt tank salt filling is set, salt must be added in strict accordance with the regulations.
The electric cabinet, water pump motor and other parts shall be protected from moisture and water to prevent burning. The equipment shall be maintained regularly and kept clean.
When installing the pipeline of the fuel gas steam generator equipment, it is necessary to consider the factors such as preventing the backflow of heated materials and the discharge of pipeline condensate (such as installing a vent valve on the steam pipe).