夜上海最新论坛

 Steam generator manufacturer
Your current location: home page > News > common problem

What should be paid attention to during commissioning of vertical oil fired gas steam generator

2020-06-09 11:31:26
second

Gas steam generator It consists of furnace body, heating pipe, water supply system, control system and shell. The heating elements are completely immersed in water, so the thermal efficiency is high. The high-pressure gear pump is used for water supply. When adding water, there is no need to stop heating or decompression, and the time is short, so the steam pressure is not affected. vertical Oil fired gas steam generator At the same time, the control system is equipped with a water cut-off alarm to automatically stop the water feeding and heating. As long as the power supply, water source and start switch are connected, it will automatically work, and normal steam supply can be achieved in 8~15 minutes. Operating procedure: in Steam generator After the water softener and water softener are installed properly, the operation can be carried out according to the procedure:

explain:

Before the product leaves the factory, the plant has carried out comprehensive commissioning for key parts of the steam generator, such as heating pipe, control box, safety valve, pressure controller, blowdown, water pump, etc.

In general, as long as the water and electricity are connected as shown in the figure, and the button of the control box is opened, the full-automatic operation can be entered without further debugging by the user.

The commissioning of water treatment shall refer to the water treatment part in this instruction manual. Press the ON/OFF key, the power supply working light will be on, the power supply will be connected, the water filling light will be on, the water pump will be started, the water supply valve will be opened, the water tank will be softened, the power supply indicator light will be on, the normal water level light will be on, the heating will reach a higher pressure, drop to a lower set pressure, and then reheat. Press the ON/OFF key, the heating light is on, the water filling light is on, the heating light is off, the heating is stopped, the heating light is on, the heating is started, and the power work light is off to stop the work.

If you want to know more about the vertical oil fired gas steam generator, you can also visit our website, hoping to help you. If you have other needs, you are welcome to call for consultation and business negotiation!

 Vertical gas steam generator


Recent browsing: